Glasair Super-II FT N59CL

 01Mar-13Mar03, 22 hours - Fit the elevator counterweight in preparation for installing fin bulkheads.  The counterweight as built still strikes the ferrite bead in the com antenna.  Reworking the counterweight was a simple matter as I had leftover lead sheet.  Continued on with trial rudder fit up, and installed the rear bulkheads once things fit well.  This was a finicky job, as there is a lot going on back there, and I did not want to remove too much material from the fin.  The lay-ups under the rudder hinge as prescribed in the manual turned out to be 4 layers too thick, so I sacrificed another router bit and cut it down to size.

19Mar03-27Mar03, 19 hours - More rudder fit up.  Laid in the aft bulkhead, then riveted the hinge in place.  Also installed a conduit along the dorsal from the baggage bulkhead to the top of the fin, and pulled power and firewire for the tail camera. 

 

 

March 2002 – 41.0 hours

Total 1785.0 hours

 

Back Up Next