14Nov01, 3 hours - Flipped the wing back upright. Laid
up wing-fuselage bottom plates.
20Nov01, 3 hours - Reinstalled fuselage with the help of friend Gary
Cler. We discovered that this is not a job for only 2, but we got
it done!
21Nov01, 3 hours - Prepped for installation of the fuselage-wing
fairing. Finished fitting the left extended wingtip. Began
final fitting of the left short wingtip.
22Nov01, 3 hours - Fit up the fairings, and installed the left side
fairing. Continued left short tip fitting.
23Nov01, 5 hours - Installed the right side fairing, laid up the top
edge of the left. Finished left short tip. Finished fitting
the right extended wingtip.
24Nov01, 3 hours - Laid up the right side. Began fitting the
right short tip.
25Nov01, 6 hours - Shaped the flap recess, and installed interior
recess bulkheads. Began constructing flap & trim motor
circuits.
26-30Nov01, 12 hours - Installed the inboard flap caps.
One of the recess bulkheads was misplaced, removed &
reinstalled. Reinstalled mock panel to measure locations to be
used when fitting panel w/o wing. Much miscellaneous sanding &
touchups requiring layup one night, sanding the next.
|