Glasair Super-II FT N59CL

02Mar01, 2 hours - Laid right side slot cap.

03Mar01, 1 hour - Removed & cleaned up slot caps.

04Mar01, 6 hours - Fabricated flap bridge top.  Laid flap hinge rear spar brackets, trimmed green. 

08Mar01, 6 hours - Filled & began forming wing top at bridge.  Cut access holes & re-installed flaps.  Trimmed aileron inboard cap to allow hardware access. Began reinstallation of ailerons.

10Mar01, 2 hours - Completed aileron installation.  Found that the aileron actuator bolt interferes with the outboard leading edge of the flap, rough trimmed accordingly.

11Mar01, 5 hours - Fabricated seatbelt brackets.  Located brackets & potted 20# foam in preparation for mounting.  To avoid working overhead, I'll complete the installation when the wing is flipped over.  Installed 2-layer precure in wingtip nav-lamp notch.

16Mar01, 3 hours - Fit short wingtip lenses.  These are the colored lenses.  I'll be using clear on the extended tips.  Began trimming & fitting extended wingtips.

17Mar01, 3 hours - Jigged & fit wingtip bottoms.  Fit main spar foam. I now must crawl under the wing to get from side to side, so I better move quickly on the tips!

18Mar01, 9 hours - Trimmed wingtip tops to fit.  Laid main spar in place.  Laid up spar cap using top skin as a mold to get the curve right.  Sealed foam for wingtip recess & misc. end caps.  

22Mar01, 1 hour - Laid up one side of the cap panel.

23Mar01, 2 hours - Laid up the balance of the cap panel.  Hit the flap extension with the heat gun, began shaping.

24Mar01, 5 hours - Continued flap extension shaping.

25Mar01, 5 hours - Bonded wingtip spar caps.  Began fabrication of nav/strobe light assembly.  This setup will fit in from inboard, rather than outboard as the plans show.  That way I'll be able to bond the lens permanently in place.

 

March 2001 – 50.0 hours

Total 779.0 hours

 